Six projects. Hotels, hospitals, data centres, schools, and industrial. Every one delivered with fab-ready BIM — not just coordination models.

Hotel 2024

Meridian Hotel & Spa

Melbourne, Australia
Scope
Full MEP coordination + fab-ready drawings
Outcome
94% fewer coordination issues post-construction vs. project average
Multi-story hospitality with 312 rooms, rooftop plant, and basement MEP zones. Delivered clash-free model 3 weeks ahead of programme.
Hospital 2024

Northern District Hospital

Auckland, New Zealand
Scope
Full MEP BIM coordination + medical gas routing
Outcome
Zero RFIs raised during construction for coordination conflicts
Acute care facility with complex medical gas, HVAC, and electrical systems across 8 floors. Achieved NZ Building Code compliance on first submission.
Data Centre 2023

Pacific Logic Data Centre

Sydney, Australia
Scope
MEP coordination model for 12MW facility
Outcome
25% reduction in electrical riser conflicts vs. prior project benchmark
High-density data centre with dedicated cooling systems, generator redundancy, and complex cable tray routing across 4 plant levels.
Education 2023

Western Suburbs School Campus

Perth, Australia
Scope
Multi-trade BIM model for 3-building campus
Outcome
Programme delivered 10 days early — model used as template for next school
1,200-student campus with auditorium, sports hall, and admin block. Modular MEP approach enabled fast-track construction.
Industrial 2024

Atlas Cold Storage Facility

Auckland, New Zealand
Scope
Full MEP + fire protection BIM coordination
Outcome
40% faster framer installation due to coordinated wall panel penetration set
30,000m² cold storage warehouse with refrigerated chambers, loading docks, and ammonia plant. Tight coordination eliminated field rework.
Residential 2025

Harbourside Residential Tower

Wellington, New Zealand
Scope
Full MEP coordination + bathroom pod prefab drawings
Outcome
Prefabrication cut 6 weeks from mechanical programme
45-storey mixed-use tower with 420 residential units. Fab-ready BIM enabled off-site bathroom pod manufacturing for 80% of units.